SmartBank Project

(Bulgaria, 2023)

project details

Project Name: SmartBank
Location: Bulgaria
Year: 2023
Developer Purpose: To provide a smart city solution supported by renewable energy

Introduction

SmartBank is Bulgaria’s pioneering smart city solution that combines urban aesthetics and technology.
Thanks to its environmentally friendly infrastructure powered by solar energy, it serves as both a recreation area and a digital service point in public spaces.

With SmartBank, citizens can:
Charge their phones
Access free Wi-Fi
Access city information on a digital screen

Not just a bank, but also a public experience of the future!

Technical Casting

Structural Features
• Wooden seating area + steel body
• Top protection panel: Angled for solar energy

Energy System
• Monocrystalline solar panel (120–180W)
• 24–48 hours of energy backup with lithium battery

Electronic Equipment
• USB charging ports (2–4 units)
• Wireless charging (optional)
• Wi-Fi modem (4G supported)
• LED lighting (with sensors)
• 21.5″ or 32″ digital information screen

IoT and Sensors
• Air quality and temperature sensors
• NFC / QR interaction
• Central software control panel
• Municipality Smart City Dashboard integration

Presentation Content (Slide Title Suggestion)

1. Introduction:
What is SmartBank, why was it developed?
2. Problem Definition:
Classic street furniture does not meet technological needs
3. Solution:
Smart, environmentally friendly, technological and user-oriented design
4. Technical Components:
Structure – Energy – Electronics – Software – IoT
5. Pilot Application (Bulgaria):
Installation location, user feedback, energy data
6. Future Plans:
Extension to city center, campuses, bus stops, parking areas
7. Investment and Partnership Opportunities

Summary for Investors
Why invest in SmartBank?
✔️ Increasing urbanization and technology needs
✔️ Infrastructure that reduces carbon footprint
✔️ Prestigious and sustainable solution for municipalities
✔️ Revenue model with advertising, data collection and service integration
✔️ Rapid scalability in developing countries and touristic areas

Return on Investment Potential:
• Payback period of 1 unit: 12–18 months
• Potential for mass sales to municipalities or campuses
• Additional income model with advertising screen revenues